Is it possible to place a list-item scheduled for different days? The item should then be displayed when I hit C-c a a
for agenda-view
. I don΄t mean a date that is repeated on a regular basis, or a range, which both are described in the manual under Timestamps, deadlines, and scheduling, but dates that are scheduled in a random way.
What I did was place three SCHEDULED
below the date:
* TODO Get schwifty
SCHEDULED: <2018-08-04 Sa>
SCHEDULED: <2018-08-06 Mo>
SCHEDULED: <2018-08-09 Th>
This makes them available agenda-view
, but the second and third entry look a bit odd as they lack the SCHEDULED
. Are there any drawbacks to what I did or is there a more elegant way to achieve this?